Road Foreman Mark French                                                                                                                                                                            Call 811 BEFORE digging. www.digsafe.com

Highway Crew: Ryan Nolan, Lead Operator; Michael Griggs, Jasson Wells, and Jeffrey Baker

Highway Department Phone: 888-4625 or highway@hydeparkvt.com. For after-hours road issues, please call the Lamoille County Sheriff’s Department non-emergency phone number 888-3502. New driveways & work within the town highway right-of-way require 19 VSA 1111 Access  Permit:

Driveway and Use of ROW 19 VSA 1111 APPLICATION for DOWNLOAD (pdf)
Use above application for all driveways/new roads, utilities & other planned work within the town right-of-way (including change of use on a property

HIGHWAY PROJECTS

Brook Road Culvert and Centerville Road Culvert – DR-4474-VT Mitigation Projects (Halloween 2019 Disaster)

PW229 Cover Letter to VT Emergency Management (01-30-2024)

PW229 Inspection reports and photos

PW229 Desroches Construction Services invoices

PW229 Various vendor invoices

PW229 Email from contractor on waste material

PW229 Watershed Consulting Invoices

Net Zero Stormwater and Streetscape Project – Church & Main Street – Preliminary Plans 2022 (PDF)

Beam Road – Right-of-Way relocation for new turnaround: Draft Road Survey Updated 9/2021 & Stormwater Materials Cost Estimate

Grants in Aid 2022 – Cooper Hill Rd Ditching & Resurfacing Project – Video 1 – Before
Grants in Aid 2022 – Cooper Hill Rd Ditching & Resurfacing Project – Video 2 – After

2023 Gihon River Bridge (at Whitcomb Island Road) Final Scoping Report, Dubois-King (FEMA BRIC Program)

2023 Green River Bridge (at Garfield Road) Final Scoping Report, Dubois-King (FEMA BRIC Program)

SINK HOLE Project Plans – MM18 Grant – Johnson St Extension (pdf)

Prospect St Reconstruction Plan(pdf)

2019 Hyde Park Road and Bridge Policy (Construction Standards) (pdf)
Access Guidance PowerPoint – VLCT 2017
Sidewalk and Path Guidance – VTrans Website
Roadside Resiliency Report – Joanne Garton – 2019 (pdf)


2020 Hyde Park Connectivity Study – Rt15 Crossing (pdf)

MRGP 2018-2038 – 20-year Municipal Roads General Permit Assessment & Map (last renewed 2023)

2017 Assessment Synopsis – Rob Moore LCPC

2017 Hyde Park Erosion Assessment Map

Hyde Park Road Erosion Inventory Report

2020 Better Connections Report – Final Report

Rural Towns – Roadway Designs (Federal Highway Administration Guidebook).

2016 Hyde Park Connectivity Project Final Report (pdf) (April 2016 – Dufrense Group)

Appendix A – Archeological & Historical Data (19MB)

Appendix B – Meeting Minutes

Appendix C – Land Use Comments

This scoping study evaluated existing conditions and presented recommendations for future capital projects and grant opportunities – Funding for this $34,400 project comes from the VTrans Bike & Pedestrian Grant Program (90%) and the Hyde Park Sidewalk & Pedestrian Improvement Reserve Fund (10%). Questions: Ron Rodjenski, 802-888-2300 x2

 

2016 North Hyde Park Stormwater and Streetscape Project Final Report (pdf) (June 2016 – Dubois King)

This scoping study evaluated existing conditions and presented recommendations for future capital projects and grant opportunities – Funding for this $31,000 project comes from the VTrans Bike & Pedestrian Grant Program (90%) and the Hyde Park Sidewalk & Pedestrian Improvement Reserve Fund (10%). Questions: Ron Rodjenski, 802-888-2300 x2

OTHER DOCUMENTS

2018 Lamoille Valley Rail Trail User Count (VAST 2016-2018) (pdf)

2017-2025 Municipal Plan (pdf)

2017 Lamoille Valley Rail Trail (Summer) User Count (pdf)

2017 Hyde Park Tree Inventory and Report (pdf)

2017 Village of Hyde Park DRAFT Sidewalk Inventory and Capital Budget (pdf)

2017 North Hyde Park Village Center Designation MAP (pdf)

2016 Village of Hyde Park Village Center Designation MAP (pdf)

2015 Village of Hyde Park Land Use and Development Regulations (pdf)

2015 Village Master Plan – Maps (pdf) and Report (pdf)

2016 High Risk Rural Road Grant Deferral – Church & Main (pdf)

2015 Emerald Ash Borer Preparedness Plan (pdf)

2014 Fire District #1 – NHP Wellhead Protection Area MAP (pdf)

2013 Hyde Park Tax Stabilization Policy (pdf)

2013 Livability Solutions Report & 2018 (pdf)

Roundabout (pdf)

Green Mountain Byway Extension (pdf)

2006 Safe Routes to School – HPES (pdf)

1992 Historic Sites Survey – North Hyde Park and Bridges (pdf)

1981 Historic Sites Inventory – Village of Hyde Park (pdf)

 


 

2016 Informational Flyer Partially funded by a grant from the Vermont Urban and Community Forestry Program 

 

Emerald Ash Borer – Hyde Park Preparedness Plan and Report (pdf)

 


 

2015 HYDE PARK ROAD COMMITTEE (Committee completed its work 9/10/15)

 

(Note: The 2016 Village Roads Working Group is a new committee focusing on developing recommendations for capital investments within the Village of Hyde Park – see VRWG minutes above )

 

2015 Committee Minutes September 10, 2015 Selectboard Meeting August 31, 2015 August 17, 2015 August 10, 2015 July 13, 2015 June 8, 2015 May 11, 2015 April 13, 2015 March 9, 2015 February 9, 2015 January 12, 2015 December 8, 2014 November 10, 2014 October 13, 2014 September 8, 2014 August 11, 2014 July 14, 2014 June 23, 2014 May 12, 2014

 


 

HIGHWAY DEPARTMENT DOCUMENTS

 

Uniform Municipal Excess Weight PermitForm Here (pdf) This form is for either a single or fleet of trucks. Fees and instructions are on the form.

 

The Uniform Municipal Excess Weight Permit approval shall be effective for no more than a one-year period ending March 31 annually. If a fleet permit, this approval covers all vehicles bearing the registrants name. If the permit is to cover unmarked company trucks, please attach a list to this form giving the year, make, VIN number, maximum weight and registration number. The holder of a permit shall be liable for any damage to highways or bridges per VSA Title 23, Sec. 1400a © and is required to furnish the municipality a valid Certificate of Insurance in the following amounts: a minimum of $100,000/$300,000 Personal Injury Liability Coverage and $100,000 Property Damage Coverage. The Certificate of Insurance must list the Town of Hyde Park, PO Box 98, Hyde Park, VT 05655 as the Certificate Holder. The Certificate of Insurance can be mailed or faxed to (802)888-6878 ATTN: Dawn Slayton.

 

2018 Class 4 Town Highway Audit (pdf)

 

Highway Access Permit – Driveways & Utilities (19 VSA 1111) (pdf)

 

2017 Town Road and Bridge Standards (for private and public roads)
2012 Town Road Acceptance Policy

 

VTrans ROW Manual 2012 Vermont Complete Streets Guidance Vermont Road and Bridge Standards – January 2013 Private Road Sign Installation Guidelines Trees and Roads – 2013; Guidance from VT Urban and Community Forestry Program

 

State Vermont Letter; Green River Dam Road – 09-09-2015

 

Hyde Park Gravel and Paved Roads – April 2015

 

Power Plant Road – History by Ruth Woodside – April 2015

 

Private Road Memo to Selectboard – 06-23-2014

 

04/10/2014 ROAD COMMITTEE MISSION STATEMENT Final Report & Recommendations – 08-31-2015 Final Road List – 08-31-2015